Building Updates

New bar and Washrooms

The old bar and washrooms have been demolished and a new bar area and washrooms have been constructed to current building codes, just ready for final painting.

IMG_1490.jpeg

Flooring  upgraded and repaired

The old floor coverings were taken up and existing floors have been repaired where we felt it was necessary & new sub-floors have been laid down to accept new floor coverings.

IMG_1706.jpeg

Second Floor renovations

Our second floor has been revitalised with all walls repaired, primed and painted.  The trim is a beautiful,  calming shade of blue.  More pictures to follow.

IMG_1708.jpeg

Walls repaired and primed for painting

Walls have been repaired and cleaned down ready for the final colors to be added - new sheetrock has been installed to meet fire regulations wherever necessary.

IMG_1702.jpeg

Food Prep Area

A new food prep area has been created in the old kitchen, it has been insulated, framed out and fitted with sheetrock, providing a new clean space for food preparation.

IMG_1498.jpeg

Unique Tin Ceiling revitalized.

Our unique decorative tin ceiling has been brought back to life with an application of a metallic bronze colour that brings out the detail, and allows it to show all of its character.

IMG_1691.jpeg

Corbels and Gutter Supports Installed

The old corbels, support boards and brickwork were removed, the brickwork rebuilt and new corbels and support boards fitted.  New guttering is on order and will be installed as soon as it's ready.  Big Thanks to PROCONSTRUTION for their excellent workmanship

Corbels.jpg

Emergency Lighting

Safety has always been at the forefront of our minds as we renovate the building.  New emergency lighting has been placed around the building to provide a safe and secure place for all to enjoy.  Great work by Gauthier Electric

IMG_1713.jpeg

TBA

Info to Follow

Insulation.jpg

Frontage has a new look

The North, and main face of the building has been washed down to remove decades of dirt and grime.  The old mortar has been cleared out and the sandstone blocks have been repointed to seal the building against weather damage.  DP Masonry have done a great job.

frontage.jpg

Exit Signs in Place

In addition to the emergency lighting, new Exit Signs have been strategicaly placed at all exits to help in the event of a situation where it is necessary to leave the building.  Safety is at the core of all we do on this project.

Fire Sign.jpg

TBA

Info To Follo

FrancisPhotography.jpg

CONTACTEZ-NOUS

Nous sommes toujours heureux d'avoir de vos nouvelles

96, rue Main

Bathurst (Nouveau-Brunswick) E2A

PO Box 391

Bathurst NB E2A 0A0

Téléphone : 1-800-000-0000

  • Facebook
  • YouTube
  • LinkedIn

SOYEZ LE PREMIER À SAVOIR

Inscrivez-vous à notre newsletter pour rester informé

POPO    

Projet de préservation de l'ancien bureau de poste de Bathurst – Propulsé par WIX

bottom of page